How long does a Full Kitchen Remodel take?
The average full kitchen remodel takes 2-3 weeks. This includes demolition, installing custom cabinets, quartz granite marble or quartzite countertops, applying a spray finish using your chosen paint color to the cabinets, installing new floors, installing new backsplash, painting walls and ceilings, ect.
How long does the average full Master bathroom Remodel take?
The average full Master bathroom Remodel take 1-3 weeks depending on scope of work. This includes demo, installing a new shower and or tub, installing custom or prefabricated cabinets, quartz granite marble or quartzite countertops, applying a spray finish using your chosen paint color to the cabinets, installing new floors, painting walls and ceilings, ect.
How do you waterproof your showers?
Waterproofing and building a correctly sloped shower pan is the most important part of a shower. We use the Schluter Waterproofing system on all our showers. Daniel and Lee are both very knowledgeable and skilled when it comes to building and waterproofing shower which is why we guarantee all of our showers to now leak and to drain correctly. It is an extremely costly if your shower is not waterproofed right. It is essentially a new shower normally to fix it which can cost more than your originally paid the first contractor. If you are going to budget on a part of your home, we do not recommend going with a cheap inexperienced contractor when it comes to your shower.
What's the process like for a full kitchen?
We began with sending out a check list and payment schedule. We then set a date. A drawing is provided for your cabinet layout. This shows what cabinets have are drawers, doors, pullouts, full height, ect. We also set a meeting at the showroom to look at countertops and one at floor and decor or Prosource to look at backsplash. We make sure to settle on cabinet layout 6 weeks prior to start date so that we can do final measures and deposit to get them inline to be built. This way they are ready the day of the install. Here's what a schedule looks like for the project-
Day 1 - Demo and haul off all cabinet and floors
Day 2- Set up area for New cabinets
Day 3 Install Cabinets- measure for countertops by 2pm
Day 4- fabricate countertops- install floors
Day 5- extra day for flooring and fabrication
Day 6- install countertops
Day 7- Install backsplash
Day8- Install Appliances and all lighting
Day 9-14 PAint prep, paint , install handles and knobs and finish off
This is a typlical schedule but does not include weekends. We normally work most Saturdays but not Sundays.
What is the process for a full Master Bathroom Remodel?
We began with sending out a check list and payment schedule. We then set a date. A drawing is provided for your cabinet layout if needed. We also set a meeting at the showroom to look at countertops and one at floor and decor or Prosource to look at tile. We provide 1 free design hour to help you choose tile. Normally we are able to settle tile during this hour. If you need additional hours- we do charge for additional design meetings. If doing custom cabinets , we make sure to settle on cabinet layout 3-6 weeks prior to start date so that we can do final measures and deposit to get them inline to be built. If you choose out prefabricated cabinets, we make sure to settle them 2-3 weeks prior just in case what you choose needs to be ordered. This way they are ready the day of the install. Here's what a schedule looks like for the project-
Day 1 - Demo and haul off , began setting up for tile
Day 2- continue setting up for tile
Day 3 waterproof and tile floor
Day 4- tile walls
Day 5- finish tile
Day 6- grout
Day 7- install countertops , baseboards, toilet, ect- prep for paint
Day8- extra day to prepare for paint to began
Day 9-14 Paint prep, paint , install handles and knobs and finish off with extra days
This is a typical schedule but does not include weekends. We normally work most Saturdays but not Sundays. Scope of work will determine exact schedule. We have remodeled full master bathrooms in as little as 7 days and have taken as long as 3 weeks. 3 weeks is normally when we are adding in retexture to the full bathroom.
How does your projects go so quick?
We have a team full of skilled individuals that know what they are doing. When you know what your doing, things go fast. Before every job, Erica meticulously plans out the teams schedule. Each Project is scheduled out and everyone is provided a schedule. Erica stays on top of the schedule as the project is under way and adjust when needed to make sure everyone is prepared and ready when its their turn with the project. The best answer to this is we are VERY organized, we all show up, and we all are skilled and experienced with all situations when it comes to remodeling.
What Countertops do you fabricate and install?
We fabricate and install quartz, marble, quartzite, and granite. We have many brands displayed at our showroom and have accounts with all brands around the Dfw area. Brands include- Cambria, Stone Collection, Daltile, Msi, Verona Marble, and much more. The fabrication is done 1 street over. We also have many remnants to choose from for smaller projects. This can save you lots of money.
How do you compare your prefab semi custom cabinets and vanities to Home depot?
This depends on which home depot cabinets we are comparing to. We sell solid wood quality prefabs, with soft clothes doors, and soft close undermount drawer guides. This is not your standard Home Depot cabinet that they have in stock on the shelves. I would compare these to the KraftMaid cabinets Home Depot sells but at a cheaper price.